For EDAC and the Northshore school board

Better options than closing Sunrise.

The district's three scenarios, what each one means, and five alternatives from Sunrise parents.

On the table

The district's three scenarios

The district presented these on October 26. Here's how each one holds up on the district's own numbers.

✓ Works ! Concern ? Not yet known
Closes Sunrise

Scenario 1

Closes Cottage Lake, Sunrise, Moorlands

Saves / yr
$3.41M
Students moved
1,178
Walkers bused
210
Considerations
  • ✓Biggest savingsSaves the most: $3.41M a year (Case A), $3.26M (Case B).S1
  • !Most students movedMoves the most students: about 1,178 districtwide, 494 on the east side.S7
  • !More busing210 walkers become bus riders, and east-side routes go from 32 to 38.S2
  • !Crowded receiving schoolsOverfills receiving schools. East Ridge would have about 478 students for 408 permanent seats (117%), and Hollywood Hill about 479 for 408.S12, S4
  • !Loses three buildingsCloses three buildings and 1,688 seats, including the only school in these scenarios confirmed on public sewer and inside the growth area (Sunrise).S3, S6
  • ✓Avoids the most repairsAvoids the most repair costs: about $23.8M scheduled for 2028–29.S5
  • ?Hidden sewage costsExtra sewage hauling at East Ridge and Wellington, which truck their sewage out, isn't counted.S6
Closes Sunrise

Scenario 2

Closes Sunrise, Moorlands

Saves / yr
$2.22M
Students moved
901
Walkers bused
158
Considerations
  • !Smallest savingsSaves the least: $2.22M a year (Case A), $2.17M (Case B). The district says it “only partially solves the problem.”S1, S7
  • !More busing, longer rides158 walkers become bus riders, which costs about $254,000 a year at the district's average cost per rider. The longest ride grows from 44 to 51 minutes.S2, S8
  • !Crowds Cottage LakeOverfills Cottage Lake. It would receive 159 Sunrise students and reach about 437 students for 367 seats (119%), with no portables.S12, S4
  • !Moves kids off public sewerSends Sunrise students to a building that trucks its sewage out and sits outside the growth area.S6
  • !Closes Sunrise as it reboundsCloses Sunrise just as its enrollment is projected to rebound, to 206 students by 2030.S3
  • ✓Fewest students movedMoves the fewest students of the three: about 901 districtwide.S7
  • ?Unpublished sewage costsThe added sewage hauling cost at Cottage Lake isn't published.S6
Keeps Sunrise

Scenario 3

Closes Hollywood Hill, Moorlands

Saves / yr
$2.34M
Students moved
945
Walkers bused
14
Considerations
  • ✓Keeps schools and classes smallerNo receiving school is pushed far past its permanent seats: Sunrise about 272 of 388 (70%), Wellington about 446 of 449 (99%), Cottage Lake about 374 of 367 (102%). Scenarios 1 and 2 push receiving schools to 117–119%.S3, S4, S12
  • ✓Room for planned growthKeeps Sunrise, the only school in these scenarios on public sewer and inside the growth area, where new housing is planned. It would still have about 116 open permanent seats, and its enrollment is projected to rebound to 206 by 2030.S3, S4, S6
  • ✓Solid savingsSaves more than Scenario 2 in both cases: $2.34M a year (Case A), $2.18M (Case B).S1
  • ✓Minimal busing impactOnly 14 walkers become bus riders. The longest ride grows from 44 to 49 minutes.S2
  • ✓Avoids costly repairsAvoids about $17.4M in repairs scheduled for 2028–29. That includes Hollywood Hill's, the highest per square foot of these schools ($326).S5
  • ✓Fills Sunrise seatsFills seats at Sunrise: about 83 Hollywood Hill students would move to Sunrise.S12
  • !Hollywood Hill closesCloses Hollywood Hill, which is outside the growth area. A school closed there would be hard to replace, and its families face the same loss.S6
  • !More moves and routesMoves 44 more students than Scenario 2 (945 vs. 901), adds two east-side bus routes, and puts two routes over 45 minutes.S2, S7
  • !District's objectionThe district's objection: Sunrise “would still be the lowest enrolled school in the district.”S7

Savings are the district's Case A estimates (2028 projected residents).S1 · Compare full costs and weigh them yourself →

Our alternatives

What we're asking EDAC to consider

Strong backed by district figures Moderate needs district analysis Needs data we're asking for it
01Strong

Wait for the rebound

Our ask: Before closing Sunrise, set a public enrollment threshold and check it again in fall 2028, after the small class has moved up.

  • Sunrise's kindergarten classes run 30–33 students. The 2024 class had 18. That class is now moving through the grades and leaves after 2029.S11
  • The district projects Sunrise's resident students bottoming out at 189 in 2028 and rising to 206 by 2030 and 210 by 2034.S3, S11
  • Before any Moorlands students are moved, the district projects Arrowhead (204) below Sunrise (206) in 2030.S3

Trade-off: Waiting means the district doesn't collect closure savings in the meantime. Scenario 2 would save about $2.2M a year.

See the class-by-class chart →
02Strong

If consolidating, choose Scenario 3

Our ask: Weigh the scenarios on full cost and disruption, not on which building has the fewest students today.

  • Scenario 3 keeps Sunrise and saves more than Scenario 2 in both of the district's cases: $2.34M vs. $2.22M (Case A) and $2.18M vs. $2.17M (Case B).S1
  • 14 walkers become bus riders, vs. 158 under Scenario 2. The longest ride is 49 minutes, vs. 51.S2
  • It avoids $17.4M in repairs scheduled for 2028–29, after closures could take effect, vs. $13.0M for Scenario 2. calcS5

Trade-offs: Scenario 3 changes schools for 44 more students districtwide (945 vs. 901) and adds two east-side bus routes. It also closes Hollywood Hill, whose families deserve the same care we're asking for.

Compare all options with your own weights →
03Strong

Count the full cost

Our ask: For each scenario, publish one-time closure costs, the real added cost of busing, sewage hauling at receiving schools, upkeep of closed buildings, and expected enrollment loss.

  • The posted savings count fixed building costs and added office staff at receiving schools. They leave out one-time, transportation and building-upkeep costs.S1, S12
  • At the district's average cost per rider, Scenario 2's 158 new bus riders cost about $254,000 a year. That's 11% of its savings. calcS2, S8
  • Under Scenario 2, most Sunrise students would go to Cottage Lake, which trucks its sewage out. The hauling cost isn't published.S6
Add the missing costs yourself →
04Moderate

Fill Sunrise's empty seats

Our ask: Add an option to the study that brings Sunrise above 300 students, through boundary changes or by placing a program there.

  • Sunrise has 245 students and 429 planned seats.S1, S4
  • Fixed cost per student is about $5,100 today. At 330 students it would be about $3,800. calcS1
  • In Scenario 3 the district already lists two Hollywood Hill pockets that border Sunrise (HH0 and HH2, 83 students).S7
  • Of the six schools we checked, Sunrise is the only one confirmed on public sewer, and it's inside the growth area, so it's the easiest site to add students to.S6

Trade-off: Students who move to Sunrise leave somewhere else. Moving the Hollywood Hill pockets alone would drop Hollywood Hill to about 274 students. A program or choice option avoids that.

Try the fill tool →
05Needs data

Retire portables first

Our ask: Have EDAC compare the cost of removing portable classrooms with closing a building, since both reduce extra seats.

  • The district has about 13,000 elementary design seats and about 9,300 students projected for 2030, including students from outside the district. calcS3
  • There are 61 portable classrooms across ten elementary schools, about 1,370 seats. That's close to the 1,688 seats Scenario 1 removes by closing three schools. calcS3

What's missing: The annual cost of keeping a portable. We're asking the district for it.

See seats across the district →
Check our math

Try the tools

Close any school and see where students go, or change the assumptions and see how the options hold up.

The timeline

What happens next

  1. Oct 26, 2026
    District presents three scenarios
    Two of the three scenarios close Sunrise.
  2. Nov 2, 2026
    Net savings estimates posted
    The posted figures don't include one-time closure costs or the cost of maintaining an empty building.
  3. Nov 23, 2026
    Written data analysis presented to the board
    Public hearings (at least one per school) follow within 90 days of this report.
  4. Dec 1–3, 2026
    Districtwide community sessions
    Show up, and bring a neighbor.
  5. Dec 8, 2026 – Mar 8, 2027
    School-specific public hearings
    Sunrise hearing date to be announced.
  6. Jan 2027
    Board gives EDAC direction on revisions
  7. Feb 22, 2027
    EDAC final recommendation to the board
    First reading at the school board meeting.
  8. Mar 8, 2027
    Board vote
  9. Fall 2028
    Earliest any change takes effect